CLDG first-party schedule data

Pipe Schedule, Flow Bore & Valve End Connection Tool

Turn an NPS and schedule into the pipe OD, wall thickness, calculated inside diameter and flow area—then compare that bore with a proposed forged-valve passage and the selected SW, BW or NPT end.

NPS 1/2–4SCH 5S / 10S / 40S / 80S / 40 / 80 / 160 / XXSSW · BW · NPT

Quick Engineering Answer

Pipe schedule changes wall thickness and therefore the available pipe bore even when nominal size and outside diameter stay unchanged. For butt-weld ends, that bore directly affects the internal transition. For socket-weld ends, the pipe OD and socket geometry control fit while schedule still changes the inserted pipe ID. For NPT, thread form and engagement—not pipe ID alone—control acceptance.

Use the approved valve drawing value.

Used only to estimate velocity.

PIPE OD60.30mm
WALL t3.91mm
PIPE ID52.48mm
FLOW AREA2163.8mm²
Enter the proposed valve bore to calculate bore mismatch.
Pipe cross-section
OD 60.30 / ID 52.48 mm
Proposed valve passage
Enter valve bore from drawing

Why nominal size alone does not define the flow path

NPS identifies a nominal pipe family. Within one NPS, the outside diameter remains fixed while schedule changes wall thickness. The calculated pipe inside diameter is:

Pipe ID = OD − 2 × wall thickness
Flow area = π × ID² / 4

A schedule change can therefore alter the area presented to the valve end even though the purchase description still says “2-inch valve.” This tool makes that hidden geometry visible; it does not replace the valve drawing, pipe specification or project standard.

Company SCH dataset used by the tool

The table below comes from the schedule lookup used in CLDG’s internal engineering workflow. Values are in millimetres and cover the small-bore range requested for public use. The published page keeps 40 and 40S, and 80 and 80S, as separate identities even where their dimensions match in this range.

NPS / DNOD5S10S40S80S4080160XXS
1/2 / DN1521.31.652.112.773.732.773.734.787.47
3/4 / DN2026.71.652.112.873.912.873.915.567.82
1 / DN2533.41.652.773.384.553.384.556.359.09
1-1/4 / DN3242.21.652.773.564.853.564.856.359.70
1-1/2 / DN4048.31.652.773.685.083.685.087.1410.15
2 / DN5060.31.652.773.915.543.915.548.7411.07
2-1/2 / DN6573.02.113.055.167.015.167.019.5314.02
3 / DN8088.92.113.055.497.625.497.6211.1315.24
4 / DN100114.32.113.056.028.566.028.5613.4917.12

Data scope: NPS 1/2–4 only; dimensions in mm. Verify the governing pipe standard, material family, tolerance and edition in the project specification before manufacture.

How schedule changes the end-connection review

Socket weld (SW)

The pipe OD is the primary fit input for the valve socket. Schedule changes the inserted pipe ID and wall remaining at the weld end. Confirm socket bore, depth, insertion gap and welding procedure against the approved drawing and project requirements; do not approve an SW end from the calculated pipe ID alone.

Butt weld (BW)

Schedule directly changes the pipe-side bore presented to the valve. Compare the calculated pipe ID with the valve end bore and review whether an internal taper or counterbore is required. ASME B16.25 covers preparation of buttwelding ends, including bevels and internal/external shaping of heavy-wall components.

NPT с резьбой

Schedule data helps describe the adjoining pipe, but thread form, taper, engagement and gaging determine connection acceptance. ASME B1.20.1 covers general-purpose inch pipe threads including NPT. A close valve-bore match does not prove a compliant thread.

Important distinction: the “proposed valve bore” field must come from an approved drawing or confirmed product data. The tool never invents a valve bore from NPS, pressure class or schedule.

Worked comparison: NPS 2, SCH 40 vs SCH 160

For NPS 2, OD stays at 60.3 mm. SCH 40 uses a 3.91 mm wall, giving a calculated ID of 52.48 mm and flow area of about 2,163.1 mm². SCH 160 uses an 8.74 mm wall, giving a calculated ID of 42.82 mm and flow area of about 1,440.1 mm². The SCH 160 area is approximately 33.4% smaller. A BW end designed around one bore cannot be assumed to match the other without checking the transition.

Need the valve drawing reviewed against a real pipe schedule?

Send CLDG the NPS, Schedule, Class and End Connection

Use this tool with—not instead of—the other engineering checks

After checking bore geometry, use the Cv/Kv liquid-flow calculator for an independent capacity estimate. Read the data-driven SW vs BW vs NPT guide for procurement implications, and the forged steel valve type guide before finalizing construction.

Часто задаваемые вопросы

Why do SCH 40 and 40S show the same number?

They match dimensionally for the listed small-bore sizes, but they belong to different schedule identities and material/pipe-standard contexts. The tool keeps them separate to prevent the identity from being lost when a specification is copied.

Does a full-port valve bore have to equal the calculated pipe ID?

Do not assume so. “Full port” definitions and product designs vary. Compare the drawing, applicable product standard and project bore requirement.

Can the tool approve a BW transition?

No. It quantifies the bore difference. The final bevel, taper, counterbore, minimum wall and tolerances must be reviewed to the applicable drawing and ASME B16.25/project requirements.

Can I use the table above NPS 4?

No. The public dataset and calculator are deliberately limited to NPS 1/2–4. Do not extrapolate.

Standards and data basis

The dimensional values are from CLDG’s internal small-bore schedule lookup dataset. Connection review references the project’s applicable pipe specification, ASME B16.25 for buttwelding-end preparation, и ASME B1.20.1 for general-purpose inch pipe threads. Technical basis last reviewed: September 2, 2026.

Want the result converted into an order-ready end-connection note?

Request a Drawing and Specification Review